国产精品无码AV无码,蜜臀久久久久久999草草,啊灬啊别停灬啊灬快点,美女露0的无挡写真

Your Position: Home > News > Activities

Installation and Daily Maintenance of Roots Pump of Oil Filter

2019/8/1??????view:

  In the operation, hoisting, installation, use and maintenance of equipment, the correct processing procedures must be strictly followed.

  Once improperly operated, the internal or external transmission parts and driving equipment of the pump may also cause serious damage to the human body. It is strictly forbidden to start the vacuum pump when the intake cover or exhaust cover of the pump and the refueling and discharging ports are dismantled. If we want to check or maintain the moving parts of the pump, we must first completely cut off and lock the control power equipment.

  Higher temperature on the surface of roots pump housing and connecting pipes and accessories may cause injury when human body contacts.

  1.Dismantling and hoisting

  1.If the pump is packed in wooden cases, care should be taken not to touch the shell of the pump when it is unpacked.

  2.If the pump does not have a lifting ring, it must be lifted with hemp rope at the front and rear end caps of the pump or carried by forklift truck.

  2.Installation site:

  Roots vacuum pump should be installed in bright, dust-free and well ventilated buildings.

  The installation environment temperature of Roots vacuum pump is 5-40 C.

  There should be enough room around Roots vacuum pump for routine inspection, maintenance, disassembly and assembly.

  3.Fondation works:

  Roots vacuum pump can be installed on the same rack as the front pump to form a unit and then installed on the concrete foundation. Large pumps can be installed on the cement foundation separately, and the reserved holes of foundation bolts can be watered with concrete.

  According to the weight of Roots vacuum pump and the pressure resistance of foundation, the compressive area and depth of concrete foundation are determined.

  In order to bury foundation bolts in concrete, sufficient voids must be left out according to the location of foundation holes when concrete foundation is poured.

  The base surface must be horizontal.

  4.Installation:

  Wood frame is made according to the position of bottom foot hole of pump or unit. The foundation bolt is fixed on the wooden frame, placed in the reserved hole, and then concrete is poured into the reserved hole, placed for several days, and the wooden frame is removed after concrete hardening.

  The roots vacuum pump is put on the foundation, the level is calibrated with a level meter, the uneven part is hardened with metal gaskets, the foundation bolts are tightened, and the bottom cracks are filled with cement.

  5. Pipeline installation:

  Notes: If welding slag and other foreign matter enter the pump during pipeline installation, Roots pump and front pump will be met.

  Cause serious damage or damage, once similar situation occurs, the pipeline and pump must be strictly cleaned up.

  There are no foreign bodies such as welding slag and impurities in the intake and outlet gas pipelines, which have sufficient channel capacity.

  A flexible hose should be installed in the connecting pipe between the outlet of Roots vacuum pump and the inlet of the front stage pump to reduce the influence of vibration of the front stage pump on the Roots vacuum pump.

  In order to shorten the pre-pumping time, besides connecting the inlet of the front pump with the outlet of Roots vacuum pump, bypass pre-pumping pipes and valves can also be installed in the general system.

  In order to prevent the return of oil or water when the front pump stops (when the front pump adopts water ring vacuum pump), the exhaust valve or check valve should be installed on the inlet pipe of the front pump.

  The connection flange of the pipeline is sealed with O-type rubber sealing ring and coated with vacuum coke grease. The whole vacuum system must be sealed without leakage.

  If the pipeline is too heavy, it must be properly supported. In order to avoid affecting the normal operation of the pump

  Vacuum pumps equipped with cooling water shall be equipped with adjusting valves on the pipes at the cooling water inlet in order to control the amount of water.

  6. Installation of electrical equipment:

  Roots vacuum pump can only work within the prescribed inlet pressure range. When the current stage pump stops working, Roots vacuum pump must stop working at the same time. Therefore, electrical equipment must have interlocking and necessary automatic overload and overheating protection devices.

  The wiring of the motor must make the steering of the pump in the direction indicated by the arrow.

  Small pumps can start directly. Large pumps should be equipped with starters, such as pressure-reducing starter.


亚洲AV永久一区二区三区| 日产精品久久久久久久性色| 无码人妻精品一区二区| 日本无码欧美一区精品久久| 农民人伦一区二区三区| 被群CAO的合不拢腿H纯肉视频| 久久久免费看黄A级毛片高清| 狠狠色噜噜狠狠狠777米奇小说| AV免费观看| 日本19禁啪啪吃奶大尺度| 波多野结衣家庭教师| 亚洲精品久久无码AV片俺去也 | 久久夜色精品国产噜噜麻豆| 4438XX亚洲最大五色丁香| 亚洲AV无码乱码国产精品麻豆| 无码人妻丰满熟妇A片护士| 男男调教后菊撑开扩张A片 | 免费无码不卡视频在线观看| 国产美女视频黄A片免费观看软件| 久久久久亚洲AV无码专区首JN| 99在线精品免费视频九九视| 九色丨PORNY丨蝌蚪视频| FREE性开放小少妇| 精品国产一区二区三区AV蜜桃| 高潮毛片无遮挡高清免费| 久久九九国产精品怡红院| 男人J桶进女人P无遮挡在线观看| 最好看的最新的中文字幕电影3| 锕锕锕锕锕锕好大好湿| 日日碰狠狠添天天爽超碰97| 亚洲欧美自偷自拍另类小说| 无码国内精品久久综合88| 久久久久欧美精品观看| 国产无遮挡18禁无码网站免费| 久久狠狠高潮亚洲精品| 无码精品A∨在线观看免费| 闺蜜撕开的奶罩猛吸我的奶| 成品网站W灬源APP免费百度| 办公室艳妇潮喷费蜜桃AV| 公交车上拨开丁字裤进入| 无遮挡边吃摸边吃奶边做|