Your Position: Home > News > Activities

Installation and Daily Maintenance of Roots Pump of Oil Filter

2019/8/1??????view:

  In the operation, hoisting, installation, use and maintenance of equipment, the correct processing procedures must be strictly followed.

  Once improperly operated, the internal or external transmission parts and driving equipment of the pump may also cause serious damage to the human body. It is strictly forbidden to start the vacuum pump when the intake cover or exhaust cover of the pump and the refueling and discharging ports are dismantled. If we want to check or maintain the moving parts of the pump, we must first completely cut off and lock the control power equipment.

  Higher temperature on the surface of roots pump housing and connecting pipes and accessories may cause injury when human body contacts.

  1.Dismantling and hoisting

  1.If the pump is packed in wooden cases, care should be taken not to touch the shell of the pump when it is unpacked.

  2.If the pump does not have a lifting ring, it must be lifted with hemp rope at the front and rear end caps of the pump or carried by forklift truck.

  2.Installation site:

  Roots vacuum pump should be installed in bright, dust-free and well ventilated buildings.

  The installation environment temperature of Roots vacuum pump is 5-40 C.

  There should be enough room around Roots vacuum pump for routine inspection, maintenance, disassembly and assembly.

  3.Fondation works:

  Roots vacuum pump can be installed on the same rack as the front pump to form a unit and then installed on the concrete foundation. Large pumps can be installed on the cement foundation separately, and the reserved holes of foundation bolts can be watered with concrete.

  According to the weight of Roots vacuum pump and the pressure resistance of foundation, the compressive area and depth of concrete foundation are determined.

  In order to bury foundation bolts in concrete, sufficient voids must be left out according to the location of foundation holes when concrete foundation is poured.

  The base surface must be horizontal.

  4.Installation:

  Wood frame is made according to the position of bottom foot hole of pump or unit. The foundation bolt is fixed on the wooden frame, placed in the reserved hole, and then concrete is poured into the reserved hole, placed for several days, and the wooden frame is removed after concrete hardening.

  The roots vacuum pump is put on the foundation, the level is calibrated with a level meter, the uneven part is hardened with metal gaskets, the foundation bolts are tightened, and the bottom cracks are filled with cement.

  5. Pipeline installation:

  Notes: If welding slag and other foreign matter enter the pump during pipeline installation, Roots pump and front pump will be met.

  Cause serious damage or damage, once similar situation occurs, the pipeline and pump must be strictly cleaned up.

  There are no foreign bodies such as welding slag and impurities in the intake and outlet gas pipelines, which have sufficient channel capacity.

  A flexible hose should be installed in the connecting pipe between the outlet of Roots vacuum pump and the inlet of the front stage pump to reduce the influence of vibration of the front stage pump on the Roots vacuum pump.

  In order to shorten the pre-pumping time, besides connecting the inlet of the front pump with the outlet of Roots vacuum pump, bypass pre-pumping pipes and valves can also be installed in the general system.

  In order to prevent the return of oil or water when the front pump stops (when the front pump adopts water ring vacuum pump), the exhaust valve or check valve should be installed on the inlet pipe of the front pump.

  The connection flange of the pipeline is sealed with O-type rubber sealing ring and coated with vacuum coke grease. The whole vacuum system must be sealed without leakage.

  If the pipeline is too heavy, it must be properly supported. In order to avoid affecting the normal operation of the pump

  Vacuum pumps equipped with cooling water shall be equipped with adjusting valves on the pipes at the cooling water inlet in order to control the amount of water.

  6. Installation of electrical equipment:

  Roots vacuum pump can only work within the prescribed inlet pressure range. When the current stage pump stops working, Roots vacuum pump must stop working at the same time. Therefore, electrical equipment must have interlocking and necessary automatic overload and overheating protection devices.

  The wiring of the motor must make the steering of the pump in the direction indicated by the arrow.

  Small pumps can start directly. Large pumps should be equipped with starters, such as pressure-reducing starter.


各种盗撮合集VOYEUR| 中国丰满人妻VIDEOSHD| 精品国产亚洲第一区二区三区| 50岁退休熟女露脸高潮| 揄拍成人国产精品视频| 极品丝袜乱系列全集大全目录| 99无码人妻一区二区三区免费 | 99久久国产综合精品| 潘金莲扬思敏全集1一5集三级| 对白脏话肉麻粗话AV| 小雪被老汉各种姿势玩弄| 每次和儿子一起睡觉就睡不着| 一个在上面吃一个在下吃视频| 邻居少妇张开腿让我爽了在线观看| 办公室爆乳女秘在线HD| 88国产精品视频一区二区三区 | 疯狂的交换1—6真实交换3和2| 男人激烈吮乳吃奶视频免费| 亚洲AV无码乱码A片无码蜜桃| 亚洲AV永久无码精品网址| 国产亚洲精品拍拍拍拍拍| 国产成人啪一区二区免费| 欧美真人性做爰一二区| 黑人巨大精品欧美一区二区| 亚洲AV无码乱码国产精品久久| 日韩人妻一区二区三区蜜桃视频| 国产精品美女WWW爽爽爽视频| 性一交一乱一乱一视一频| 蜜臀AV色欲A片无码精品一区| 秘书被老板CAO到合不拢腿| 日日躁夜夜躁狠狠躁| 日韩国产精品无码一区二区三区 | CHINESE玩弄老年熟女| 宝宝怎么这么湿~别磨| 办公室娇喘的短裙老师在线视频 | 被捣出白浆潮喷失禁抽出好爽| 色噜噜人体337P人体| 99精品欧美一区二区三区黑人| 蜜臀AV在线播放一区二区三区| 人妻献身系列第54部分| 迈开腿让我要吃尝尝你的草莓|