国产精品无码AV无码,蜜臀久久久久久999草草,啊灬啊别停灬啊灬快点,美女露0的无挡写真

Your Position: Home > Support > FAQ

Installation of Safety Gas Ballast Valve for Vacuum Oil Filter

2019/8/1??????view:

  Installation of selected ballast valves

  SOGEVAC SV200-300 with air ballast valve or SOGEVAC SV200-300 without air ballast valve can be selected according to customers'requirements. Gas ballast valves also have various models.

  Remove the fastening screw at the top of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom of the cover (7/94), and remove the cover.

  Put the oil out.

  Remove screw (6/13) and gasket.

  Install the selected air ballast valve (6/14) with bolts and gaskets.

  Re-fitting and oil filling.

  Note:

  LEYBOLD USA sells pumps, standard air ballast valves are standard equipment.

  Repair

  warning

  Cut off the power supply before removing the pump. It must be absolutely guaranteed that the pump can not start accidentally.

  warning

  If the pump has pumped harmful substances, it is necessary to understand the nature of the hazards and take appropriate safety measures.

  Comply with all safety regulations.

  Maintenance of LEYBOLD Maintenance Station

  If you send the pump to LEYBOLD maintenance station, please indicate whether the pump has any substances harmful to human health, or whether it is contaminated. If the pump has been polluted, the nature of the hazard must be explained. For this purpose, you must use the form we have prepared, which will be provided to you as required.

  At the end of the instruction sheet, there is a copy of the form "Instructions for Contamination of Vacuum Equipment and Components".

  Please attach this form to the pump or pack it with the pump. This description is needed to meet the requirements of regulations and protect our staff.

  If there is no "pollution instructions", the LEYBOLD maintenance station will return the received pump to the shipper's address.

  warning

  The packing of the pump must be guaranteed that the pump will not be damaged during transportation, so that harmful substances will not spill over from the packing box.

  If you turn on the pump in your own factory, also pay attention to whether there is pollution.

  Important Notes

  When handling used oil, please observe the relevant environmental regulations.

  According to the design idea, the SOGEVAC pump needs very little maintenance under normal working conditions. The required maintenance work is described in the next section.

  All work must be performed by trained personnel. Improper maintenance or overhaul will affect the life and performance of the pump, and affect the claim for warranty.

  Daily maintenance system

  The maintenance frequency described in the daily maintenance system is the approximate value of the normal operation of the pump. Maintenance times should be increased under adverse environmental conditions and/or corrosive media conditions.


亚洲产国偷V产偷V自拍| 亚洲乱码一区AV春药高潮| 国产偷亚洲偷欧美偷精品 | 成人AV在线观看| 中文WWW新版资源在线| 精品亚洲A∨一区二区三区| 亚洲精品无码| 亚洲精品国产SUV一区88| 呦交小U女国产精品视频| 中文字幕亚洲欧美日韩在线不卡| 久久精品国产亚洲av瑜伽| 天天摸夜夜添狠狠添婷婷| YING荡的雯雯第三部分| 欧美综合自拍亚洲综合图片区| 久久久无码精品亚洲日韩按摩| 单亲与子的性关系A片| 久久亚洲国产成人精品性色| 女的让弄多少次下边才不紧| ASIAN艳丽的少妇PICS| 扒开腿狂躁女人爽出白浆| 妺妺窝人体色WWW聚色窝| 小受被多男摁住灌浓精A片 | 亚洲日韩精品无码专区网址| 国产AV无码专区亚洲精品| 捏胸吻胸添奶头GIF动态图| 清纯校花挨脔日常H| 国产老熟妇精品观看| 免费无码又色又爽的视频软件| 国产精品高潮呻吟久久AV无码| 日本熟妇乱妇熟色A片蜜桃| 国产日韩一区二区三免费高清| 大J8黑人BBW巨大怪物| 农民人伦一区二区三区| 97色偷偷色噜噜狠狠爱网站| 性强烈的欧美三级视频| 久久久久人妻一区精品性色AV| 8X福利精品第一导航| 成人夜色视频网站在线观看| 非洲黑人又大又粗免费A片| 粗大的内捧猛烈进出少妇视频| 国产乱码精品一区二区三区四川人 |